• serpecon

A Busy Week At Serpecon

Busy this week building a new replacement stainless steel silo roof to replace the damaged GRP roof for Southern Water. Our scope included not only the removal of the original damaged roof but a full structural design and replacement to support a new separate walkway and a 750kg drive unit. A new larger replacement 500mm diameter centreless screw conveyor has also been installed to reduce the risk of sludge emulsification. If you are worried about your old cracked GRP silo roof being unable to safely support existing machinery or you need a separate self-supporting walkway for access. Please do not hesitate to contact us. Sales@serpecon.co.uk #silos #screwconveyor #shaftless #centreless #sludgedewatering






18 views0 comments

Recent Posts

See All